Factory Layout Plan & Approval Company
The Department of Inspection for Factories and Establishments (DIFE) is a department under the Ministry of Labor and Employment approved the Layout Plan. It is necessary for Factory License.
Why Choice EMS Engineering Technology
EMS is one of the best experience Engineering Consulting Firm to create a Factory Layout Drawing for new and existing Factory Building With approval, also support Factory License Renew at maximum 10-15 days after getting agreement.
Layout Plan Including Document List.
- Master Layout Plan / Site Plan / Location Map
- Front Elevation
- Back Elevation
- Section/Cross Section (x-x or y-y)
- Machine Including Layout Plan
- Dore Window Schedule
- Generator and sub-station Location Indicate
- Production Flow Chart
- Child Care and Day Care Location Indicate
- Separate Toilet of Male & Female
- Canteen Location Indicate
- Emergency Stair and Exit Indicate
- Minimum one Emergency Exit Indicate
Required documents for Layout Approval.
- Update Trade License for factory
- Rent Agreement/Land Mutation Copy (If Possible)
- NID of Applicant
- Soil Test Report of the land (If Possible)
- Update Fire License Copy
- Approval Design by Local Authority (If Possible)