Factory Layout Plan & Approval Company

The Department of Inspection for Factories and Establishments (DIFE) is a department under the Ministry of Labor and Employment approved the Layout Plan. It is necessary for Factory License.

factorey layout plan & approval

Why Choice EMS Engineering Technology

EMS is one of the best experience Engineering Consulting Firm to create a Factory Layout Drawing for new and existing Factory Building With approval, also support Factory License Renew at maximum 10-15 days after getting agreement.

Layout Plan Including Document List.

  • Master Layout Plan / Site Plan / Location Map
  • Front Elevation
  • Back Elevation
  • Section/Cross Section (x-x or y-y)
  • Machine Including Layout Plan
  • Dore Window Schedule
  • Generator and sub-station Location Indicate
  • Production Flow Chart
  • Child Care and Day Care Location Indicate
  • Separate Toilet of Male & Female
  • Canteen Location Indicate
  • Emergency Stair and Exit Indicate
  • Minimum one Emergency Exit Indicate

Required documents for Layout Approval.

  • Update Trade License for factory
  • Rent Agreement/Land Mutation Copy (If Possible)
  • NID of Applicant
  • Soil Test Report of the land (If Possible)
  • Update Fire License Copy
  • Approval Design by Local Authority (If Possible)